11.14.2010, FEC
Created front-end interface for object-oriented project tracking database using Silverlight and ASP.NET.
9.9.2010, FEC
Integration of Autodesk Vault 2011 and custom C#/WPF software allows project managers to track each part in an assembly in real time as it is manufactured.
3.26.2010, P&G
Customized an XML based configuration engine to allow for new equipment design and advanced stress simulations.
9.19.2009, P&G
Worked to increase automation of an engineering workflow requiring outside contractors. Savings of over $50,000 a year.